Skip to main content

TDI-Brooks Continues Offshore Wind Momentum On The US East Coast

By Eric Van Rees - 12th September 2022 - 07:28

From the start of early Spring 2021, TDI-Brooks continues to drive forward in an emerging market performing marine site investigations for several of the offshore wind operators on the US East Coast.

“TDI-Brooks operates four (4) research vessels on the spot market with two (2) US-flagged research vessels dedicated to the wind farm market on the East Coast. Our specialty is the survey, geotechnical and benthic components of these wind farm projects” Dr. Jim Brooks, President and CEO of TDI-Brooks stated.

In April 2021, TDI-Brooks re-mobilized its two (2) US-flagged research vessels (R/V Brooks McCall and R/V EMMA McCALL) to Fall River, MA to perform over the rest of 2021 several different Wind Farm projects located South of Long Island, New York and South of Nantucket and Martha’s Vineyard. These projects are on-going through December 2022 with the EMMA McCALL having some availability starting in early September. The picture below shows these two (2) vessels dockside at Fall River.

The geotechnical component along cable routes and within lease blocks consisted of deploying a variety of tools including their Feritech FT550 electric and TDI-Brooks designed pneumatic vibrocorer (pVC) systems along with their Datem Neptune 5,000 (N5K) and 3,000 (N3K) cone penetrometer test rigs (CPT). The picture below shows deployment of TDI-Brooks pVC. The benthic components were mostly ROV transects and grab sampling. Hundreds (100’s) of VCs, CPTs, ROV transects and grab/box core samples were acquired.

Upon completion of the geotechnical vibracoring, all samples are sent to the TDI-Brooks’ ISO-certified geotechnical and environmental laboratories in College Station, Texas for testing.

Read More: Marine Surveying Utilities

Subscribe to our newsletter

Stay updated on the latest technology, innovation product arrivals and exciting offers to your inbox.

Newsletter