GeoConnexion
 
Home
 
Geo: International
 
This month's issue Online News Online Articles
 
GeoConnexionUK
 
This month's issue Online News Online Articles
 
GEOlympics
 
GeoRisk
 
GeoResources
 
Recruitment Directory Events Education Subscription Contact Details Media Pack Spring Company Showcase ISPRS - Information From Imagery FIG - International Federation of Serveyors
 
Login
Email: Password:

 

Forgotten your details?
Click here
 
 
Click here to download Adobe Acrobat Reader

Geo: International > News > News Item

Wind Farm Positioned with Ashtech® ProFlex™ 500s

Emden, Germany (May 11, 2010) - Five Ashtech ProFlex 500 GNSS receivers are helping guide the operations of the self-propelled jack-up vessel Bard Wind Lift I, the first construction vessel specially designed for installing offshore wind turbines, to build the first commercial wind farm in the German North Sea. The Ashtech GNSS receivers are used for every maneuver of Wind Lift I, including precisely positioning the vessel, assisting it to accurately jack itself up from the seabed on 71 meter long legs, and installing the foundation piles for the wind turbines.

EIVA, the Danish provider of system solutions and services for marine survey, provided the positioning solution for Bard, the German designer, builder and operator of the offshore wind farm. EIVA created and installed the special positioning system employing five Ashtech ProFlex 500 GNSS receivers integrated to a survey grade gyrocompass and a motion sensor. Two of the Ashtech receivers are located on two of the legs of the Wind Lift 1. Another antenna is located on the 500-tonne crane boom at the stern of the vessel, and a fourth ProFlex 500 is on the supply barge lying alongside to assist the crane’s operator during lifting operations. Lasers measure the distances between antennas and distance to the deck during pile driving. All sensors are interfaced to EIVA’s software NaviPac to manage placement of the piles. A fifth ProFlex 500, placed on a separate platform in the BARD Offshore 1 operational area, acts as a reference station to provide the required centimeter-level accuracy.

The 500-ton crane on the stern of Wind Lift I hydraulically grips and lifts the foundation pipes and positions in an exact position on the bed of the North Sea. Then the vessel’s pile hammer drives the support pipes into the seabed. Once the supporting crosspiece, which weighs around 450 tons, has been mounted, the tower, nacelle and finally the rotor, 122 meters in diameter, are installed. The EVIA pile positioning solution ensures that the foundations are placed efficiently and vertically despite their enormous size and difficult sea conditions.


For more information visit:

Ashtech


Geo: International

 

Past Issues - Archive
Autodesk - One of the Best Places to Work in UK… More…
25 May 2012, 6:12pm
Telogis and FleetCor Announce Global Partnership… More…
25 May 2012, 6:08pm
CHC opens its European Repair Center… More…
25 May 2012, 6:05pm
Sky News Report on 3D Printing Airs Today… More…
25 May 2012, 5:54pm
GPS helps track endangered elephants… More…
25 May 2012, 9:20am
New sats to help physicists forecast space weather… More…
18 May 2012, 9:24am
Saving lives with Google Maps … More…
18 May 2012, 9:14am
Scientists count penguins from space… More…
24 April 2012, 8:40pm
Improving the Accuracy of ASTER EO data … More…
19 March 2012, 10:32am
This Month's Burning Issue...
Each month we select a hot topic and a leading figure in the industry to write about it.
This month's burning issue:

Adopting Cloud computing can save money, but good governance is essential to manage the risk argues Mike Small

Emden,, Germany, (May, 11,, 2010), -, Five, Ashtech, ProFlex, 500, GNSS, receivers, are, helping, guide, the, operations, of, the, self-propelled, jack-up, vessel, Bard, Wind, Lift, I,, the, first, construction, vessel, specially, designed, for, installing, offshore, wind, turbines,, to, build, theMore…


Website content & images remain the intellectual property of GeoConnexion Ltd. All rights reserved